Case Study 1: Prioritizing Projects at D.D. Williamson

In: Business and Management

Submitted By cdennis22
Words 809
Pages 4
Case Study 1: Prioritizing Projects at D.D. Williamson
Crystal D.
Dr. Donny Bagwell
Managing Human Resources Projects: HRM 517
October 27, 2013

Introduction D.D. Williamson implemented a new process for project prioritization that included focusing on the vision and impact of projects and narrowing down projects by selecting the ones of high importance and assigning them to senior management teams. I will attempt to critique that process, recommend an improvement for the process, provide a scenario of why the process could possibly not be successful, and project if the process will still be successful in five years.

Critiquing D.D. Williamson Project Prioritization The prioritization process at D. D. Williamson is a great improvement opposed to the previous prioritization process that was implemented. I believe that D.D. Williamson was able to finally overcome challenges after years of not having a successful process in place. Cutting down the amount of projects from 60 to 16 was a smart plan that in return helped D.D. Williamson not to go over budget, increase the success rate to over 60 percent of projects finishing close to the expected completion date, and earn better results. This process also helped to move forward the most critical projects of high importance. Simplifying the criteria ratings also helped to narrow down projects and prioritize them. By selecting a new criteria rating and focusing on the Vision Impact Projects (VIPs), it made it easier for the management team to focus on projects that would have a impact on corporate objectives and monitor them better in weekly meetings to overcome barriers before they occurred.

Improving the Prioritization Process Though the proposed prioritization process at D.D. Williamson is a vast improvement opposed the prior process, I would recommend adding more criteria to…...

Similar Documents

Case Study 1: Green Computing Research Project – Part 1

...Case Study 1: Green Computing Research Project – Part 1 CIS 517 - IT Project Management Student: Robert Lawson Instructor: Dr. Stephen Huber Project Title: Green Computing Research Project Date of Authorization: October 1 Project Start Date: October 1 Projected End Date: April 1 Project Manager: Ito, 999-9999, ito@wearebig.com ------------------------------------------------- Budget Summary: The firm has allocated $500,000 for this project. It will be used in efforts to assist in achieving the goals that have been set forth in the project objectives. This includes purchasing systems and software to support recommended changes, development life cycle of software, and funding changes related to power optimization within the datacenter (i.e., managed PDUs, etc.). Furthermore, funds will also be used to assist and support telecommuting team members to access resources involved in the project. ------------------------------------------------- Project Objectives: The project objectives are as follows: * Assist in following the company goal of helping improve the environment while increasing revenues and reducing costs. * Research possible applications of green computing. * Provide an extensive report, including financial analysis and recommendations on what green computing technologies to implement. * Discover ways to save power and compute resources. * Minimize the company’s overall carbon footprint, while cleaning, maintaining, and...

Words: 434 - Pages: 2

Prioritizing Projects at D. D. Williamson

...Prioritizing Projects at D. D. Williamson Dianne M. Dowling Human Resource Project Management Strayer University Dr. Lila Jordan April 26, 2013 Abstract D. D. Williams was founded in 1865 and today is a global leader of non-artificial coloring. They operate in nine (9) facilities in six (6) countries and supplies many of the best-know food and beverage companies. Though time has brought about many changes, the organization finally realized what needed to transpire in order to bring their mission and vision into becoming the outstanding company they are today. With strategic planning and prioritizing, D. D. Williamson has learned what it takes to be successful and what brings positive results (Kloppenborg, Nkomo, Fottler& McAfee, 2012). Prioritizing Projects at D. D. Williamson Prioritizing is the process of translating strategic objectives into operational priorities. It involves deciding which projects or types of projects to do and which not to do. Through prioritizing agencies direct resources, time and energy to projects that are deemed more important and lucrative in achieving the objective of the organization success (Mintzberg, 1994). Strategic planning is an organizational activity that is used to set priorities, focus energy and resources, strengthen operations and ensures that employees and other shareholders are working toward common goals. It is a disciplined effort that produces decisions and actions that......

Words: 1297 - Pages: 6

Case Study 1: Prioritizing Projects at D.D. Williamson

...Case Study 1: Prioritizing Projects at D.D. Williamson HRM 517 – Managing Human Resource projects Strayer University June 21, 2013 What was the Prioritization Issue at D.D. Williamson? In the case study of D.D. Williamson, it appeared the organization was successful in many ventures, but lacked the ability to manage certain projects. In fact, critical projects that required attention were left to the waste side, and as a result lead to missed opportunities, or resulted in going over the allocated budget. Within the organization of D.D. Williamson, there appeared to have been a breakdown in communication, which blinded the organization in determining projects that needed the most attention. Through the process of the organization’s investigation, which took approximately three years, leaders realized the they had no accurate system in place for marking the level of importance in each of their projects. In researching the writings of Kloppenborg, Nkomo, Fottler, and McAffee (2012), D.D. Williamson would have benefited from utilizing a project management team, whom would have identified the scope of the project, cost, and taken ownership of the schedule from start to finish. D.D. Williamson would have benefited from having developed a well-rounded project team, or several teams could have managed each project independently. Furthermore, each team could have managed the project based on the urgency of each project, the cost, and the practical details......

Words: 1197 - Pages: 5

Prioritizing D.D. Williamson

...1. Critique the prioritizing process at D. D. Williamson. D.D. Williamson (Williamson) is the world leader in caramel coloring and natural coloring for foods and beverages with global operations on five continents since founded in 1865. Over the years, the company has managed to be successful in many business endeavors, as well as withstanding the test of time by being in existence almost 150 years (DDW, 2013). In this time, Williamson has experienced many difficulties but yet has managed to overcome them all and their problem with prioritizing was no different. In this case study, Williamson had trouble managing projects that were successful, so they took a step back and pinpointed the cause of this issue. They found the cause to be the lack of project prioritization. There were projects of great importance being pushed to the side while meaningless project were being started. As a result of this, projects were gone over budget and there were probability many missed opportunities due to their disorganization. So they took time to devise a plan that would help them better select the projects that were more useful to the organization. The process took about three years to settle on a strategy that would bring success to their critical projects. With management being one of the essential tools needed for project management, Williamson’s first approach was where senior management worked together to select a maximum of two projects per senior sponsor by a set of criteria and......

Words: 1013 - Pages: 5

Prioritizing Projects at D.D. Williamson

...Prioritizing Projects at D.D. Williamson Jessie Bruswick July 18, 2014 Introduction What are the key components that keep a business or company afloat? Most business owners and CEOs would suggest a business plan, budget, qualified and experienced workers, goals for the business, great leadership, and maybe even trial and error. All of these suggestions are sure contributions to the success of any business, but we must not forget prioritizing. This case study will help us to see and understand that D. D. Williamson Company made prioritizing very crucial and necessary in the building, growth, and success of the company. Many companies have all the previously mentioned attributes, but without having a since of priority, the company will soon fail. After realizing some failed projects, D.D. Williamson began taking a closer look at what was really important. Prioritizing allows companies like D.D. Williamson, the opportunity to step back and see what’s important, very important, and least important. With that knowledge, the company can take its best managers or leaders and put them on projects that require more attention, skill, and knowledge, while other sub-projects can be seen after by others with not as much experience. Literature Review Critique the prioritizing process The process previously used by D. D. Williamson Company in 2004, caused a weakness that was two-fold. The company had too many projects that were considered as high importance and the......

Words: 1007 - Pages: 5

Prioritizing Projects at D.D. Williamson

...Prioritizing Projects at D.D. Williamson 2014 October 20 HRM 517/ Professor Stephen Castellese Prioritizing Projects 1 Introduction Keeping any organization above water takes a few key components. These components are not limited to strategic planning, goals, budgeting, qualifications, leadership and loyalty. These components will make for a successful organization as long as they remember to prioritize. A case study has been conducted on the business of D.D. Williamson. The D.D. Williamson Company has not been one to lack success, but has lacked the ability to manage projects. Because of its lacking ability to manage projects they have missed out on opportunities and have exceeded budgets. After reading the case study we see that there has also been a clear breakdown in the communication when dealing with projects assignments. It took nearly three years before investigating and upper level management to figure out that there were no precise systems put into place for marking projects level of importance. Prioritizing is necessary and crucial to an organization for growth, planning, and success. According to Kloppenborg, Nkomo, Fottler, and McAffee (2012), D.D. Williamson would have benefited from utilizing a project management team, whom would have identified the scope of the project, cost, and taken ownership of the schedule from start to finish. Critique the prioritizing process at D. D. Williamson. This company would have benefited......

Words: 1041 - Pages: 5

Project Mgnt 770 Case Study 1

...1. What criteria would you recommend USP use in selecting its projects this year? The criteria I would recommend USP in selecting its projects this year would be the initial cost, how much would production increase, decrease lead-time, is the project a necessity (silk screen or inkjet printer). 2. Based on your recommended criteria, what projects would you recommend USP fund this year? Are there any types of projects you would recommend USP pursue that were not proposed? If USP would invest $700,000, I would recommend USP to pursue the purchase of inkjet printers because they have a lower initial cost, the productivity will be the same as the new silk screen printer and it is a necessity. They will also be able to add more printers if needed to increase production in the future for $23,500. The payback will be less than one year compared to the silk screen. The four-color positives project would cut lead time to the process in place. With a cost of $175,000 and reoccurring cost of $375 each job. Pursue the ISO 9000 project in order to get processes standardized and then being able to go global. Then there are still some resources to get the ink mixing procedure less specialized. Possible projects that were not proposed could be digital printing or what new processes are being used now in the industry. 3. What, if any, additional information would you want in making your recommendations? How would you go about obtaining this information? How......

Words: 381 - Pages: 2

Prioritizing Projects at D. D. Williamson

...Prioritizing Projects at D. D. Williamson Critique the prioritizing process D. D. Williamson. D. D. Williamson is a small privately held company. Founded in 1865 in Louisville, Kentucky, D. D. Williamson has become a global leader in non-artificial colors (Kloppenberg & Nkomo, 2012). The company has grown to nine operating facilities in six countries and supplying many food and beverage companies around the world. D. D. Williamson had too many projects that were all deemed important. Even though the project was ongoing, some projects were late, over budget, and not achieving the predicted results (Kloppenberg & Nkomo, 2012). With so many active and important projects, the company decided to implement a prioritization matrix. The prioritization matrix was an excellent way to prioritize the company’s projects and improve the budget and on-time rates. As of 2009, the company made more changes to their prioritization process. They decided to choose no more than five “Vision Impact Projects” that would get high-level focus and attention (Kloppenberg & Nkomo, 2012). Projects are now receiving more in depth attention. Suggest at least one recommendation to improve the prioritizing process. Although D. D. Williamson has an effective prioritizing process, any method can be improved. The first thing D. D. Williams can do to improve the prioritizing process. Knowing that whatever process that is done the greatest impact will be on the stakeholder......

Words: 771 - Pages: 4

Hrm517 Week 3 Case Study 1 Prioritizing Projects at D. D. Williamson (Chapter 2) Hrm 517 Week 3 Case Study 1 Prioritizing Projects at D. D. Williamson (Chapter 2)

...517 HRM517 Complete Course Week 1 to Week 11 Click below link for Answer or visit www.workbank247.com Download Answer here http://workbank247.com/q/hrm-517-hrm517-complete-course-week-1-to-week-11/11579 http://workbank247.com/q/hrm-517-hrm517-complete-course-week-1-to-week-11/11579 HRM517 Complete Course Week 1 to Week 11 HRM517 Week 1 Discussion "Human Resource Management and Project Life Cycle" Please respond to the following: Explain the elements of project management and its relationship to human resource management. Evaluate the importance of understanding the various stages of the project life cycle and its possible contributions to a project.   HRM517 Week 2 Discussion "Strategic Planning and Organizational Restructuring" Please respond to the following: Assess the merits of this statement by incorporating a specific personal project, formal or informal. “Strategic planning is critical in the overall effectiveness of project management.” Imagine you are the CEO of a growing international manufacturing organization in need of corporate restructuring. Select an organizational structure, (functional, matrix, or projectized) and assess the influence on project roles and decisions made in both your home country and overseas. HRM517 Week 3 Discussion "Project Charter" Please respond to the following: Dissect the elements of a project charter, explaining the importance of each element. Next, research a minimum of two project charter templates from a......

Words: 2056 - Pages: 9

Hrm517 Week 3 Case Study 1 Prioritizing Projects at D. D. Williamson (Chapter 2) Hrm 517 Week 3 Case Study 1 Prioritizing Projects at D. D. Williamson (Chapter 2)

...Complete Course Week 1 to Week 11 Download Answer here visit www.workbank247.com http://workbank247.com/q/hrm-517-hrm517-complete-course-week-1-to-week-11/11579 Download Answer here http://workbank247.com/q/hrm-517-hrm517-complete-course-week-1-to-week-11/11579 HRM517 Week 1 Discussion "Human Resource Management and Project Life Cycle" Please respond to the following: Explain the elements of project management and its relationship to human resource management. Evaluate the importance of understanding the various stages of the project life cycle and its possible contributions to a project. HRM517 Week 2 Discussion "Strategic Planning and Organizational Restructuring" Please respond to the following: Assess the merits of this statement by incorporating a specific personal project, formal or informal. “Strategic planning is critical in the overall effectiveness of project management.” Imagine you are the CEO of a growing international manufacturing organization in need of corporate restructuring. Select an organizational structure, (functional, matrix, or projectized) and assess the influence on project roles and decisions made in both your home country and overseas. HRM517 Week 3 Discussion "Project Charter" Please respond to the following: Dissect the elements of a project charter, explaining the importance of each element. Next, research a minimum of two project charter templates from a variety of source. Then., evaluate the selected project charter......

Words: 2038 - Pages: 9

Hrm 517 Week 3 Case Study 1 Prioritizing Projects

...517 WEEK 3 CASE STUDY 1 PRIORITIZING PROJECTS To purchase this visit here: http://www.activitymode.com/product/hrm-517-week-3-case-study-1-prioritizing-projects/ Contact us at: SUPPORT@ACTIVITYMODE.COM HRM 517 WEEK 3 CASE STUDY 1 PRIORITIZING PROJECTS HRM 517 Week 3 Case Study 1 - Prioritizing Projects at D. D. Wil Read the case titled: “Prioritizing Projects at D. D. Williamson” found in Chapter 2. Write a 3-5 page paper in which you: 1. Critique the prioritizing process at D. D. Williamson. 2. Suggest at least one (1) recommendation to improve the prioritizing process. 3. Create a scenario where the implemented process at D. D. Williamson would not work. 4. Project five (5) years ahead and speculate whether or not D. D. Williamson will be using the same process. Justify your answer. 5. Use at least four (4) resources in this assignment. Your assignment must:  Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.  Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.  Activity mode aims to provide quality study notes and tutorials to the students of HRM 517 Week 3 Case Study 1 Prioritizing Projects in......

Words: 255 - Pages: 2

Prioritizing at Dd Williamson

...Prioritizing Projects at D.D. Williamson HRM 517 October 23, 2011 Prioritizing Projects at D.D. Williamson This paper will critique the prioritizing process at D.D. Williamson; suggest one recommendation to improve the prioritizing process, a scenario to discuss where the implemented process at D.D. Williamson would not work, and a long term goal of five years from now speculating whether or not D.D. Williamson will be using the same process. D.D. Williamson has nine natural coloring operations on five continents since founded in 1865. With that said, it took D.D. Williamson three years; two iteration to reconcile on an approach that significantly increased the company success rate with critical projects they now call VIP (Vision Impact Projects) (.Kloppenborg, 2012 p 48) D.D. Williamson began its first approach to prioritize the company senior management team, being that it is the company major management support system. With this, the senior management teams would have a limit of two projects per senior management totaling 16 projects. According to D.D. Williamson, the company thought it was a great move ahead because the year before, the senior management teams had been challenge to monitor over 60 improvement projects (Kloppenborg, 2012, p 48). Although the company improved to well over 60 percent, there were still some problems. Some projects were not moving forward as planned and came to be a critical investment for D.D. Williamson. The company......

Words: 1008 - Pages: 5

Prioritizing Projects at D.D. Williamson

...The 9 Essential Skills of Human Resources Management - How Many Do You Have? Human Resources Management Key Skill #1: Organization Human Resources management requires an orderly approach. Organized files, strong time management skills and personal efficiency are key to the Human Resources function. You’re dealing with people’s lives and careers here, and when a manager requests a personnel file or a compensation recommendation that lines up with both the organization and the industry, it won’t do to say, “Hold on. I’ll see if I can find it.” Human Resources Management Key Skill #2: Multitasking On any day, an HR professional will deal with an employee’s personal issue one minute, a benefit claim the next and a recruiting strategy for a hard-to-fill job the minute after. Priorities and business needs move fast and change fast, and colleague A who needs something doesn’t much care if you’re already helping colleague B. You need to be able to handle it all, all at once. Human Resources Management Key Skill #3: Discretion and Business Ethics Human Resources professionals are the conscience of the company, as well as the keepers of confidential information. As you serve the needs of top management, you also monitor officers’ approaches to employees to ensure proper ethics are observed. You need to be able to push back when they aren’t, to keep the firm on the straight and narrow. Not an easy responsibility! Of course, you always handle appropriately, and never divulge to......

Words: 579 - Pages: 3

Green Computing Research Project – Case Study 1

...head: PROJECT CHARTER Project Charter Name University Professor April 22, 2012 Project Title: Green Computing Research Project – Part 1: Project Integration Management Date of Authorization: April 23, 2012 Project Start Date: April 23, 2012 Project Finish Date: October 22, 2012 Project Manager: Name, (XXX) xxx-xxxx, email Summary Schedule: * Research possible applications of green computing to be delivered as follows: * Data center and overall energy efficiency (deliver on 1st month) * The disposal of electronic waste and recycling (deliver on 2nd month) * Telecommuting (deliver on 3rd month) * Virtualization of server resources (deliver on 4th month) * Thin client solutions (deliver on 5th month) * Use of open sources (deliver on 5th month) * Development of new software to address green computing for internal use and potential sale to other organizations (deliver on 6th month) Project Budget Summary: The firm has been given $500,000 for this project. More funds are available to pay expert consultants for advice, and purchase books and related articles as needed. Project Objectives: The project plan developed as a result of this charter will provide an extensive report, including detailed financial analysis and recommendations on what green computing technologies to implement. Official project request forms for recommended solutions would also be created as part of the project.......

Words: 553 - Pages: 3

D.D. Williamson

...Critique the prioritizing process at D.D. Williamson D.D. Williamson’s prioritizing process started off not good but once they realized their mistakes they were able to sit down and rethink their prioritizing process. As mentioned, “We took three years and two iterations of our prioritization process to finally settle on an approach that dramatically increased our success rate on critical projects (now called VIPs, or “Vision Impact Projects”). ( Kloppenborg, Nkomo, Fottler, McAfee, 2012) Even though it took them a minimum of three years they realized their mistakes and were able to overcome their negatives results and turn those results into a negative. Not all projects will be successful or even start off successful, but D.D. Williamson never allowed their unsuccessfulness to prevent them from continuing on with their projects. D.D. Williamson showed enough loyalty to their employees to know that they were overwhelmed on the number of projects they had on the table they “hired a continuous improvement manager to serve as both our project office and a key resource for project facilitation.” ( pg 48) In my opinion, D.D. Williamson showed a high level of professionalism when they brought on additional employees for their company. With that being said they were able to increase their success rate to sixty percent and that was higher than the previous year. Suggest at least one (1) recommendation to improve prioritizing process. hin the 1970s with......

Words: 1229 - Pages: 5

Unduh APK | עברית | Nourrisson Bébé Fille Garçon Père Noël Chapeau de Barboteuse Costume Déguisement