Project Preliminary

In: English and Literature

Submitted By vhedden
Words 6841
Pages 28
PRELIMINARY REPORT
Project Name Project Address

(Part 1 of 3)
Date

T2408SamplePrelim

29-Jul-2010

Enforcement Agency Use Building Permit #

Checked by/Date

GENERAL INFORMATION
Date of Plans Building Conditioned Floor Area

39,700

Climate Zone

12
HOTEL/MOTEL GUEST

BUILDING TYPE PHASE OF CONSTRUCTION

NONRESIDENTIAL NEW CONSTRUCTION

HIGH RISE RESIDENTIAL ADDITION ALTERATION

STATEMENT OF COMPLIANCE
This Certificate of Compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the State Building Code. This certificate applies only to a building using the performance compliance approach.
Documentation Author Signature Date Telephone

The Principal Designers hereby certify that the proposed building design represented in the construction documents and modeled for this permit application are consistent with all other forms and worksheets, specifications, and other calculations submitted with this permit application. The proposed building as designed meets the energy efficiency requirements of the State Building Code. Title 24, Part 6. ENV. LTG. MECH. 1. I hearby affirm that I am eligible under the provisions of Division 3 of theBusiness and Professions Code to sign this document as the person responsible for its preparation; and that I am licensed in the State of California as a civil engineer, mechanical engineer (envelope & mechanical only), or electrical engineer (lighting only) or I am a licensed architect. 2. I affirm that I am eligible under the provisions of Division 3 of the Business and Professions Code Section 5537.2 or 6737.3 to sign this document as the person responsible for its preparation; and that I am a licensed contractor performing this work. 3. I affirm that I am eligible under Division 3 of the Business and Professions Code to sign this document…...

Similar Documents

Preliminary Research for Apple

...Preliminary Research Brief Summary: * History: * Company Name: Apple * Location: 1 Infinite Loop Cupertino, CA 95014 U.S.A. 408-996-1010 Description of company: Apple Inc. (Apple), incorporated on January 3, 1977, along with its subsidiaries, is engaged in designing, manufacturing and marketing mobile communication and media devices, personal computers, and portable digital music players. It also sells a range of related software, services, peripherals, networking solutions, and third-party digital content and applications. The Company’s products and services include iPhone, iPad, Mac, iPod, Apple TV, a portfolio of consumer and professional software applications, the iOS and Mac OS X operating systems, iCloud, and a range of accessory, service and support offerings. It also sells and delivers digital content and applications through the iTunes Store, App Store, iBookstore, and Mac App Store. During the year ended November 24, 2011, the Company, as part of a consortium, acquired Nortel Networks Corporation’s patent portfolio. In February 2012, the Company acquired app-search engine Chomp. Apple sells its products worldwide through its retail stores, online stores, and direct sales force, as well as through third-party cellular network carriers, wholesalers, retailers, and resellers. In addition, the Company sells a range of third-party iPhone, iPad, Mac and iPod compatible products, including application software, printers, storage devices, speakers,......

Words: 957 - Pages: 4

Preliminary Report

...Dankers Our first meeting took place on the 20th of Febuary 2013. We discussed what parts each of us were doing and scheduled the tasks each of us have to complete. We are going to try and do most of the project as a group so that we agree with each other. We plan to meet twice a week to discuss our plans. Week 1 | March 4st-8th | Choose our particular operations model that best suits Dankers. | Week 2 | March 11th-15th | We will meet up and discuss the work and research we have all carried out. | Week 3 | March 18th-22nd | We will begin to combine and collect our information and start to build the plan. | Week 4 | March 25th-29th | At this stage we hope to have completed the plan giving us time before the due date. | We have divided the parts equally into the following parts: X will research different operations models, using course concepts and ACS. X will look at customers perspective and what would best suit them. X is going to look at market expectations and research what would be the best way for Dankers to forward into their new venture. Challenges: Some challenges that we might face is agreeing on the plan that best suits Dankers. This is why we have agreed to meet twice a week so that we all agree with each member is putting into the plan. We do have a due date so we have made a timetable that will make sure we have it done on time....

Words: 259 - Pages: 2

Preliminary Business Report

...Preliminary Business Report Cullen creative cooking Pty Ltd Submitted by: BALJIT BALJIT KAUR SHYAMKUMAR PALAYIL SASEENDRAN VINU SUNILKUMAR Introduction This report provides an overview of the role of BPM and value chain. The report will highlights the problems the Cullen creative cooking Pty Ltd is facing and will priorities them on the bases of most urgent. It will include the modified organizational structure of the company, along with the as-is and to-be diagram. It also provides an insight to the project scoping diagram and will provide possible solution for the company. Based upon the report their will be some recommendation for the company in order to improve their business Table of Contents 1. Business process management (BPM) and strategy 4 2. Problem Analysis 5 Fig 2.1 Project scoping diagram 6 3. Proposed solution 6 Fig 3.1: As is diagram 7 3.2 To be diagram 8 4. Solution considerations: 9 Fig 4.1 modified organization chart 10 4.2 What changes to be made? 10 4.3 How to do it 11 4.4 Common areas of cost 11 5. Recommendations 12 6. References 13 1. Business process management (BPM) and strategy BPM is a way to connect and integrate all the business processes in such a way so as to determine the additional performance improvement. While some might refer it to as an analysis of the value chain.(Singh 2012) ...

Words: 2427 - Pages: 10

Preliminary Investment Proposal Checklist

...| Preliminary Investment Proposal - Information Checklist1. Brief description of project. 2. Sponsorship, management & technical assistance:  * History and business of sponsors, including financial information. * * Proposed management arrangements and names and curricula vitae of managers. * * Description of technical arrangements and other external assistance (management, production, marketing, finance, etc.). 3. Market & sales:   * Projected production volumes, unit prices, sales objectives, and market share of proposed venture. * Potential users of products and distribution channels to be used. * Present sources of supply for products. * Future competition and possibility that market may be satisfied by substitute products. * Tariff protection or import restrictions affecting products. * Critical factors that determine market potential. 4. Technical feasibility, manpower, raw material resources & environment:   * Comments on special technical complexities and need for know-how and special skills. * Possible suppliers of equipment. * Availability of manpower and of infrastructure facilities (transport and communications, power, water, etc.). * Breakdown of projected operating costs by major categories of expenditures. * Source, cost, and quality of raw material supply and relations with support industries. * Import restrictions on required raw materials. * Proposed plant location in relation to suppliers, markets,......

Words: 1010 - Pages: 5

Preliminary Research Design

...Individual Research Project – Preliminary Research Design Lori Whidbee American InterContinental University Abstract The first part of this paper examines the similarities and differences between formal research and business proposal. The paper finds that the process taken for both research methods are comparable in nature. However, both research methods have difference uses in business. The purpose, use and goals of the research determines whether formal research or business proposals add value to the decision making process in corporate world. Part two of the paper examines a hypothesis question: What are the effects of human resources outsourcing on leadership performance and employee commitment? Upon review of several journal articles, research suggests that the outsourcing of key human resource functions such as training, employee benefits, and recruitment has had a positive impact on leadership performance and employee commitment. Human resource professionals indicated the delegation of more complex tasks to third-party administrators has given them the opportunity to practice core competencies with employees which has resulted in a satisfied workforce. Individual Research Project – Preliminary Research Design Managers are required to make decisions in business every day. Making the right decision can mean the difference between a financial gain or loss and retaining or losing valuable employees. Bazerman (2009) states most of our decisions are......

Words: 1888 - Pages: 8

Project Report on: Strategic Planning, Financing and Implementing a Preliminary Implemantation

...| ECI PROJECT PLAN2014-15 | bcorp | [Date] | [Course title] | | | ECI PROJECT PLAN2014-15 | bcorp | [Date] | [Course title] | | PROJECT REPORT ON: STRATEGIC PLANNING, FINANCING AND IMPLEMENTING A PRELIMINARY IMPLEMANTATION IN “EXOTIC CAR INC (ECI) FOR 03 YEARS”. With this project report we are explaining about the project strategic plan, analysis, appraisal, finance and preliminary implementation for initial 03 years. Also, we will study all phases of project like - project planning, project analysis, project initiation, project implementation, and project result. Every stage is vital to make a project success. The major areas of the project reports are defined below: Project planning and analysis: 1. ANALYSIS We are about to create a new Project activity plan for ECI. We are about make a plan which will be feasible to implement for attaining more customer and for attaining quality of service 24/7. In this Analysis we will do in-depth study of all the departments of ECI from production to marketing to make a solid analysis of ECI business ways. 2. Detailed planning I. Technical feasibility The Technical Feasibility Study reports shows the details of how ECI will deliver a product or service i.e., materials, labor, transportation, technology needed, etc. A increase in business productivity in ECI would reach through its Technical belongings and thus the Technical products like Materials for car services, Car washer machines...

Words: 1604 - Pages: 7

Project

...records all transactions. The files are uploaded once a week to the central system server located at the company’s head office. 3. At the head office sales data from each store are consolidated, and the files are then archived and permanently stored. 4. At the end of each month, the bank sends an electronic statement of all credit card and debit card transactions. This file contains a summary of transactions and a detailed list of transactions that were declined and the reasons they were declined. You have asked your assistant to perform a preliminary analysis of the sales files from each store and of the file sent by the bank for credit card and debit card transactions for the past 3 months. Exhibit A3-1 shows the results of this analysis for a sub-period of 9 days, which was done using CAATs; below is a legend. Other files available in the central system are the employee file and the duty roster. Exhibit A3-1: Preliminary analysis of sales files by store Legend: Sales file TRNO: | Unique transaction number automatically generated by the system | TRDATE: | Transaction date | TRTIME: | Transaction time | TRAMT: | Total amount of transaction | PAYTYPE: | Type of payment |   | 1: cash |   | 2: Visa |   | 3: MasterCard |   | 4: debit card | CARDNO: | Credit or debit card number | AUTHNO: | Authorization number for the transaction | EMPNO: | Employee number of the person processing the transaction | File containing details of credit and debit......

Words: 4292 - Pages: 18

Preliminary Investigative Report

...Preliminary Investigation Report: Range Tasking System Introduction My organization is currently organized with a Detachment at Fort Dix, NJ, but our headquarters is located at Fort Lee, VA. We were sent on a forward mission to train Soldiers going to overseas locations. We were assigned Range Operation. We have no experience in this field and were not sure what information had to be maintained. We decided that we needed a range tasking system. System Request Summary The range tasking system would receive incoming requests for training from our higher headquarters. It needs to assign a team to operate the range. It needs to monitor the amount of man hours are used to run the range and the total man-hours the team has worked per week. It needs to keep track of the unit that is being trained and the total size of that unit. It also needs to calculate the percentage that passed and/or needs to be re-trained. Preliminary Investigation Findings 1. The system that is in place now is very confusing to the untrained person. Information is sometimes lost or misplaced. The system that is in place repeats a certain step twice and this causes duplication of information. 2. The current system assigned individuals to certain responsibilities on the ranges and took the power away from the team leader. The team leader was unable to keep track of man-hours because they never knew when they personnel worked. The team leader was overworked looking for personnel......

Words: 761 - Pages: 4

M3-Assignment 2: Lasa 1—Preliminary Strategy Audit

...M3-Assignment 2: LASA 1—Preliminary Strategy Audit http://homeworklance.com/downloads/m3-assignment-2-lasa-1-preliminary-strategy-audit/ M3-Assignment 2: LASA 1—Preliminary Strategy Audit The end result of this course is developing a strategy audit. In this module, you will outline and draft a preliminary framework for your final product. This provides you with the opportunity to get feedback before a final submission. In Module 1, you reviewed the instructions for the capstone strategy audit assignment and grading rubric due in Module 5. By now, you have completed the following steps: • Identified the organization for your report • Interviewed at least one key mid-level or senior-level manager • Created a market position analysis • Conducted an external environmental scan in preparation of your final report and presentation In this assignment, you will generate a preliminary strategy audit in preparation for your final course project. Prepare a report that includes the following: • In preparation for your course project, prepare the preliminary strategy audit using the tools and framework you have focused on so far including the following: o Analysis of the company value proposition, market position, and competitive advantage o External environmental scan/five forces analysis • Identify the most important (5-7) strategic issues facing the organization or business unit. o You may modify the strategic issues in your final report based on the additional......

Words: 1117 - Pages: 5

Projects

...Project Kick-Off Meeting Dwayne A. Blanchette BUS 611: Project Planning and Management Dr.: Donald McKay April 25, 2016 Recently the project charter for transitioning the Quick Drop 100 (QD100) from New York to Florida received final authorization. I was awarded the project and assigned as project manager (PM) to lead a team of qualified individuals and complete the task of relocating the QD100 program to the state of Florida. The next step in the preparation phase is to hold a project kickoff meeting. This meeting will be used to acclimate team members, clients, and other attendants to ensure everyone understands the key players and their respective roles. As the PM I plan to generate enthusiasm, motivation, and excitement while maintaining a guided discussion regarding the content, schedule, and duration of the project from start to finish. To prepare for the meeting I will accomplish several preliminary tasks. The most important areas to consider during preparation include identifying stakeholders, communication methods, team building, accountability and code of conduct. Once the tone has been set and key points discussed the meeting will conclude by first reiterating member expectations and responsibilities followed by a summary of all pertinent information. The bottom line is this kickoff meeting will be presented as such to ensure all relevant attendants and stakeholders are provided a transparent achievable list of goals. Stakeholders A......

Words: 1862 - Pages: 8

General Maths Preliminary

...Project of Student Name:……………………………… | Teacher: ……………………….. | Task No: 3 | Date Due: Continuous Final: Week 3, Term 3, 27th July 2015 | Topic: Assessment on Mathematics and Driving FSDr1 Costs of purchase and insurance FSDr2 Running costs and depreciation | Marks: Part A -Report (40%) Part B- In class Assessment Task (60%) | Weighting: 20 % | Outcomes to be assessed: MGP-1 uses mathematics and statistics to compare alternative solutions to contextual problems MGP-2 represents information in symbolic, graphical and tabular form MGP-3 represents the relationships between changing quantities in algebraic and graphical form MGP-5 demonstrates awareness of issues in practical measurement, including accuracy, and the choice of relevant units MGP-6 models financial situations relevant to the student’s current life using appropriate tools MGP-7 determines an appropriate form of organisation and representation of collected data MGP-8 performs simple calculations in relation to the likelihood of familiar events MGP-9 uses appropriate technology to organise information from a limited range of practical and everyday contexts MGP-10 justifies a response to a given problem using appropriate mathematical terminology. | Buying a car Candice is 24 years old, single and lives in Orange,......

Words: 1996 - Pages: 8

Project Management - Based on Your Understanding Examine What Are the Preliminary Activities to Be Taken Up Before a Large Infrastructure Project Like This Can Be Started

...contact aravind.banakar@gmail.com www.mbacasestudyanswers.com ARAVIND – 09901366442 – 09902787224 PROJECT MANAGEMENT 1. How would you gain insights based on the case into the planning for a major project. 2. Analyze the importance of planning in order to reduce risks, cost, and delays. 3. What is Build-Operate-Transfer Model? Explore the possibilities offered by the Build-Operate Transfer model in the execution of such large and complex infrastructure projects. 1. Based on your understanding, examine what are the preliminary activities to be taken up before a large infrastructure project like this can be started 2. Establish the significance of the role of a project manager in project execution 3. Illustrate the importance of the right work culture in successful project management and the importance of managing the various stakeholders in a project. 4. What do you presume are the difficulties involved in the execution of large infrastructure projects in developing countries, and how these can be overcome? 1. Enumerate the facts of the case. 2. Based on the facts analyze the market feasibility of such project 3. Identify the importance of a project plan and control mechanisms for the successful implementation of such a huge project 4. Establish the involvement of external factors and its influence on the technically success of a project. 1. Bring out the Facts ( such as situation, solution ,benefit etc ) of the case. 2.......

Words: 343 - Pages: 2

Project

...- HIGHLY PRELIMINARY Publicly-Owned Parking Assets near ESC Power Balance Pavilion -12,000 spaces -70% utilization for Kings games -30-50% utilization for other events • 9,200 spots within ½ mile of ESC – 8,263 offstreet – 1,024 onstreet • • • Low utilization after 5pm Higher utilization anticipated from 180-200 events per year Tapping existing inventory reduces project cost and increases foot traffic to nearby dining and shopping Intermodal will provide alternatives Estimated $1-5M/year in new potential revenue opportunities generate by ESC opportunity 8 • • EARLY ANALYSIS - HIGHLY PRELIMINARY Parking Inventory 9 EARLY ANALYSIS - HIGHLY PRELIMINARY Billboards: Three Models • Traditional Lease – Lease to billboard company for a fixed amount plus percentage of revenue – Borrow against future revenues OR negotiate 10-20 year pre-paid lease – Favorable if long-term lease secured with blue chip partner • One-Time Sale – Entitle signs and sell rights and permits – Make one-time sale to billboard company for the rights to billboard – Yields higher upfront revenue but lower future revenue streams • Own and Operate – Build signs and operate as part of signage program – Capture revenue by direct sales as owner and operator of signs – Best long term cash flow implications, but most speculative NOTE: Signage would likely require permit approvals from city and in some cases, state 10 EARLY ANALYSIS - HIGHLY......

Words: 785 - Pages: 4

Coca Cola Preliminary Analysis

...1) Documentation of at least three initial scholarly sources from the library a) Sellers, Patricia Woods Wilton (1997-10-13) "WHERE COKE GOES FROM HERE". b) Hiebig, Roman G, 2003 The Successful Marketing Plan c) Pendergrast, Mark 2nd edition, 1994 “For God, Country and Coca-Cola” 5. Preliminary analysis of leadership and Organizational behavior concept: Coca-Cola launched “Project Kansas” which was their secret mission to reformulate Coke. This blunder was overseen by key Coca Cola executives CEO, Roberto Goizueta, Ike Herbert, chief marketing officer and Sergio Zyman, senior VP-Marketing (Pendergrast, 1994). They uses the matrix departmentation concept where they utilize the both the functional and divisional departmentation concept. Using the functional structure Coca Cola’s teams or group are created based on common functions from a bottom-up manner President and CEO, Presidents of research and development, marketing, finance, human resources, and under them managers. They are controlled and coordinated from Coca Cola’s top management level. With the use of the divisional structure within Coca Cola teams are organized in set of divisions. Each of their divisions has its own set of functional units President/CEO then Presidents and under them Vice Presidents the organization’s divisional managers run company operations in a general region of the globe. The functions of each vice president are divided into functions such as human resources,......

Words: 803 - Pages: 4

Preliminary Risk Valuation in Indonesia Coal Bed Methane Project (Case: Pertamina Cbm Project)

...PRELIMINARY RISK VALUATION IN INDONESIA COAL BED METHANE PROJECT (Case: PERTAMINA CBM Project) DEWI GENTANA & DEDI YUSMEN PERTAMINA CBM TEAM Gas Asia Conferences, Kualalumpur 17-18 March 2009 OUTLINE A. RISK VALUATION APPROACH & METHODOLOGY B . SUB SURFACE, SURFACE, ECONOMICS C . RISK VALUATION RESULT AND ANALYSIS D. CONCLUSION Gas Asia Conferences, Kualalumpur 17-18 March 2009 1 OVERVIEW Overlapping Oil and Gas Working Area with Coal Mining Consession Area CBM (0-1000 M) OIL AND GAS > 1000 M Casing 9-5/8” caused by Coal Mining activity at UBEP Tanjung Field Bursting Production Pipe caused by tractors at UBEP Tanjung Field Gas Asia Conferences, Kualalumpur 17-18 March 2009 2 OUTLINE A. RISK VALUATION APPROACH & METHODOLOGY Gas Asia Conferences, Kualalumpur 17-18 March 2009 3 PERTAMINA CBM RISK VALUATION MODEL (Simple Model) COUNTRY & INDUSTRY ENV. •Country Risk •Economy • •Environment •General Issue •Petroleum Legislation •Energy Balance •Competitors •Activity PROJECT ECONOMICS •Economic Indicators •Commercial Types •Taxes •Fiscal Terms SURFACE AREA (25%) PRODUCTION FACILITY BUSINESS ENVIRONMENT ECONOMIC INDICATOR LAND ACCESS PROJECT ECONOMICS (25%) TECHNICAL/SUBSURFACE GEOTECHNICAL •Data •Basin •Reserves •Play Type •Petroleum Systems •Technical Feasibility POTENTIAL RESERVE (50%) Pertamina CBM Team, 2007. (Modified From De’Ath) Gas Asia Conferences, Kualalumpur 17-18 March......

Words: 1134 - Pages: 5

6 rponses |  Alternative | Download